Quality

Conformance you can see, not just claim

Procurement teams are right to be sceptical of suppliers who describe their quality in adjectives. This page sets out what we actually do, what we measure with, and exactly where our certification stands.

Approach

Quality is a process decision, not an inspection result

A part that fails final inspection has already consumed material, machine time and a slot in the schedule. We would rather design the failure out at planning stage than catch it at the end. That means reviewing the drawing before quoting, agreeing the control plan before cutting, and approving a first-off before committing a batch.

Inspection equipment

  • Vernier calipers and micrometers
  • Height gauges and surface plates
  • Bore gauges and depth micrometers
  • Thread and plug gauges
  • Surface roughness comparison
  • Hardness testing (coordinated)
The control loop

Six checks between enquiry and dispatch

01

Drawing and DFM review

Every enquiry is read before it is quoted. Ambiguous tolerances, missing datums and features that will be expensive to hold are raised with you at this stage, not discovered on the shop floor.

Next step:
02

Control plan

Critical characteristics are identified from the drawing and matched to a measurement method and frequency before production is scheduled.

Next step:
03

First-off approval

The first part from a setup is measured against the control plan and signed off before the batch is released to run.

Next step:
04

In-process checks

Checks continue at the agreed frequency through the batch, so drift is caught while it is still correctable rather than at the end.

Next step:
05

Final inspection

Finished parts are inspected against the drawing before packing, and non-conforming work is segregated rather than shipped for concession.

Next step:
06

Documentation and dispatch

Inspection records, material certificates and any first-article documentation are compiled and travel with the consignment.

Paperwork

Documentation that travels with the parts

Your incoming inspection should not have to chase us for records. What the job requires is agreed at quote stage and prepared as part of the work.

Material test certificates

Mill certification traceable to the heat number, supplied with the consignment.

Dimensional inspection reports

Measured values against drawing nominals for the characteristics on the control plan.

First-article inspection

Full dimensional report on the first part from a new job, where your process requires it.

Certificate of conformity

Written confirmation that the supplied parts conform to the agreed drawing and specification.

Certification

Certification status

We publish our certification status honestly rather than implying approvals we do not hold. Our quality management system is built around the principles of ISO 9001. If your procurement process requires a specific certification or a supplier audit, contact us and we will tell you plainly where we stand.

Next step

Need a supplier audit or a specific certification?

Tell us what your procurement process requires. We will give you a direct answer about where we stand rather than a brochure.